BJF Group was appointed to deliver a lighting upgrade within a nationally significant public building. Due to the sensitivity of the site, the location has requested to remain unnamed.

The building’s lighting system had become outdated, inefficient, and in places unsafe, requiring full replacement with a modern, compliant alternative. With public access ongoing throughout the work, careful coordination was required by BJF Group to respect the building’s listed status and deliver on schedule.

At a glance

  • BJF Group was selected based on a strong track record in similar environments.
  • Works completed in a listed environment, with minimal disruption to the public.
  • Delivered on time to meet the site’s schedule.

Client and Scope

BJF Group were selected for this project following a competitive tender process, based on BJF’s proven ability to work within sensitive, high-profile environments.

The project required replacing the ageing lighting system with a modern, energy-efficient alternative.

Given the importance of the site, all work had to be carefully managed to ensure safety, protect the valuable contents of the location, and meet strict deadlines.

Work included:

  • Removal of the existing lighting system, including outdated components and wiring.
  • Installation of new LED luminaires and updated wiring to improve efficiency and safety.
  • Cleaning and clearing of existing trunking to ensure a safe and tidy installation.
  • Electrical testing, certification, and the handover of spare components for future maintenance.

Project Goals

  • Improve lighting quality and energy efficiency.
  • Upgrade the system to meet modern electrical safety regulations.
  • Complete work while ensuring minimal disruption to staff and the public.

Execution and Results

With a tight timeframe to complete the work due to scheduled events, BJF Group’s team carefully planned each phase of the project. Working closely with in-house staff, the team coordinated electrical isolations, site access, and safety measures to ensure smooth execution.

From the outset, the team took extra precautions to protect historical contents and delicate surroundings, and when ready, engineers systematically removed the old lighting, installed new LED fittings, and rewired the system to meet current regulations.

Careful handling was required to ensure all work met strict compliance standards, including The Electricity at Work Regulations (EWR) 1989 and BS 7671 Wiring Regulations. Each circuit was tested and re-energised before the team carried out a final inspection to confirm quality and performance.

The project was completed ahead of schedule, delivering a safer, more efficient lighting system while preserving the character of the historic setting.

Summary

BJF Group delivered a much-needed lighting upgrade while taking great care to protect the historic surroundings of the site. With a tight deadline in place, the team executed the project while keeping disruption to a minimum.

By carefully removing the old system and installing updated LED lighting, the team improved both safety and reliability at the site. The result is a brighter, more efficient system that complements the building’s heritage, while meeting the needs of those who use it every day.